• Complete HDPE Pipe Production Line
  • Complete HDPE Pipe Production Line
  • Complete HDPE Pipe Production Line
  • Complete HDPE Pipe Production Line
  • Complete HDPE Pipe Production Line
  • Complete HDPE Pipe Production Line

Complete HDPE Pipe Production Line

Type: Pipe Extruder
Plastic Processed: PE
Product Type: Pipe Extrusion
Feeding Mode: One Feed
Assembly Structure: Integral Type Extruder
Screw: Single-Screw
Samples:
US$ 1/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

Contact Supplier

Diamond Member Since 2020

Suppliers with verified business licenses

Basic Info.

Engagement System
Full Intermeshing
Screw Channel Structure
Deep Screw
Exhaust
Don′t Exhaust
Automation
Automatic
Computerized
Computerized
Transport Package
Strench Film and Wood Pallet
Specification
ACM-PE-500
Trademark
ACM
Origin
China
HS Code
8477800000

Product Description


Complete HDPE Pipe Production Line

Complete HDPE Pipe Production Line
Complete HDPE Pipe Production Line
Complete HDPE Pipe Production Line
Complete HDPE Pipe Production Line
Complete HDPE Pipe Production Line
Complete HDPE Pipe Production Line
Complete HDPE Pipe Production Line

MORE PHOTOS FOR PE PPR PO HDPE PIPE EXTRUSION MAKING MACHINE
Complete HDPE Pipe Production Line

Complete HDPE Pipe Production Line
Complete HDPE Pipe Production Line
Complete HDPE Pipe Production Line


AFTER SERVICE
Technical documentation
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English.
Arrangements for inspection, installation and testing of the equipment
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc.
b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory.  
c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer.
d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory.
e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer.
Quantity and quality guarantee
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. 
b. Guarantee period and after-sales services: 13 months from the date of the bill of lading.
During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. 
c. Long-term service:
Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance.




 

Send your message to this supplier

*From:
*To:
avatar Miss Eva
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now