Secured Trading Service

UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line

  • Audited Supplier
  • 7 yrs

Contact Supplier

Product Highlights

  • Comprehensive Warranty Coverage: 13 months warranty from bill of lading date with free spare parts for quality issues.
  • Twin-Screw Extrusion Technology: Features full intermeshing twin-screw design with deep screw channel structure.
  • Wide Pipe Production Range: Capable of producing pipes ranging from 20mm to 800mm in diameter.
  • On-Site Installation Support: Engineers assist with installation, testing, and operator training at buyer's factory.
  • Long-Term Technical Guidance: Provides spare parts at reasonable prices and technical support beyond one year.
  • English Documentation Included: All equipment symbols, manuals, layout plans, and electrical plans are in English.
  • Automatic Computerized Control: Fully automatic operation with computerized control systems for precision.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line

UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line pictures & photos
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line pictures & photos
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line pictures & photos
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line pictures & photos
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line pictures & photos
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line pictures & photos
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
  • UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
  • UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
    UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
  • UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
    UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
  • UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
    UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
  • UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
    UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
  • UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
    UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
  • UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
    UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line

Find Similar Products

Product Description

UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line

MORE PHOTOS FOR PVC UPVC CPVC PIPE EXTRUSION MAKING MACHINE 
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line
UPVC PPR PE PP Water Electric Conduit Pipe Extrusion Production Line



AFTER SERVICE
Technical documentation
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English.
Arrangements for inspection, installation and testing of the equipment
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc.
b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory.  
c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer.
d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory.
e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer.
Quantity and quality guarantee
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. 
b. Guarantee period and after-sales services: 13 months from the date of the bill of lading.
During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. 
c. Long-term service:
Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance.




 

About the Supplier

This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR2341686". Items marked "verified" are certified.

Watch Video
Watch Video
Suzhou Acmtech Machinery Co., Ltd.
Suzhou Acmtech Machinery Co., Ltd.
Suzhou Acmtech Machinery Co., Ltd.
Suzhou Acmtech Machinery Co., Ltd.
Suzhou Acmtech Machinery Co., Ltd.
Suzhou Acmtech Machinery Co., Ltd.
Suzhou Acmtech Machinery Co., Ltd.
Suzhou Acmtech Machinery Co., Ltd.

About Our Factory & Business Background

Address
Room 1608, Building B, Huijin Center, Renmin East Road, Yangshe Town, Suzhou, Jiangsu, China
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main Products
PVC Filler Machine, Seedling Board Production Line, Roof Tile Machine, Sheet Machine, Plastic Shredder

Our Industry Experience & Global Business Record

Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the warranty period?
The warranty period is 13 months from the date of the bill of lading.
What happens if there are quality issues during the warranty?
We provide spare parts without charge for quality issues. For malfunctions caused by improper operation, parts are provided at cost prices.
Do you provide installation and training services?
Yes, our engineers assist with installation, testing, and provide free training for operators and maintenance personnel at the buyer's factory.
Who covers the travel and accommodation costs for engineers?
The buyer is responsible for round-trip air tickets, visa fees, meals, accommodation, and an allowance of $80.00 per day for each engineer.
What is the lead time for production?
The average lead time is 1-3 months, regardless of whether it is peak or off-season.
What is the acceptable pipe range for this machine?
The machine can produce pipes with a diameter ranging from 20mm to 800mm.
What happens if commissioning is not requested within four months?
If commissioning is not requested within four months from the bill of lading date, the equipment is considered successfully tested and approved by the buyer.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now